The Peak, Stirling Sports Village

One of the latest 50 metre pools and Leisure Complex to open has 666 Marathon glass lockers in several different colours, with a similar theme continued through the 85 Marathon Classic cubicles, which have contrasting frame doors and pilasters to comply with DDA/IFI requirements.  The Designs by Architects, S & P, have also specified, Cabrillant glass showers cubicles and a large quantity of bench seating, duct panelling and vanity units.  A major feature of this project is the use of toughened and laminated ceramic painted glass construction for the lockers and shower cubicles.  The Peak is a typical project where Marathon systems use all the relevant components in a high use changing and washroom area.