Marathon Club Cubicles - Description
Marathon Club is a Flush Fronted 30mm Panel system which is available for both Wet and Dry areas. A 30mm panel consisting of HPL faced PU Core has been specially developed for those wanting a flush fronted cubicle system for shower areas, while a Melamine Faced Chipboard cubicle which is perfect for office, schools, shops bars and restaurant toilet facilities. Featuring an aluminium headrail and recessed, adjustable feet, Marathon Club also has embedded profiles to not only give a rebated appearance, but prevent any line of sight for privacy.
Laser edge-banding of a Polypropylene strip on every panel, welded with an invisible adhesion joint for a perfect look, gives improved resistant to both moisture and dirt.
Marathon Club Cubicles - Key Benefits